Week 7

    Why did I choose to work alone?  Well, the first week, I wasn't hear to the fact that I was down in Georgia because of a family emergency. The project was started when I was gone, and by the time I got back at the end of week one, all other six people were paired up, thus forcing me to work alone. It would have been easier than working alone. Assuming that I was hear, and we had to do this again, I would insist on having Heishmen as my partner, since he's a flash genious. I would get him to teach me how to do flash and work with him to make the project easier on me.  We would work together in every aspect of the project and I would know a lot more about flash than I do now. I would also have made some sort of awesome game with his help. 

    I would also have someone to help me on the final project.  Since Heishman's a flash genious, he would be able to make some pretty awesome examples of what the most awesome potentials of flash are.  They would be made even more the better because, since he knows a lot about flash, he could put in reference to our class.  Having someone who could share the workload with me would also make the final project easier, as I could focus on making the powerpoint nice, and  he could, since he's great at flash, focus on the lessons and examples.  It would be much easier coming up with 30 minutes of material with two people basically doing 15 minutes instead of one person doing 30 minutes.  Also, we would have the ability to colaberate on what to do, making it even that much more better, using each other's strenghts to cover for the weaknesses.  

No feedback has been posted yet.